Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EBOM Campus and Performance Periods

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Kath Williams  on 

How is the performance period determined when submitting EBOM campus credits under master site? Individual buildings will not be submitted for 8 more months but the campus credits are ready now.

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Dec 16, 2015, 9:06 pm

Assembled Wood Materials

NC-v4 EQc2:Low emitting materials
posted by  Mike Miller  on 

We manufacture Architectural wood doors made with wood composites which are CARB NAF and wood composites which are not included in the CARB requirements, i.e., structural composite lumber.

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Dec 16, 2015, 4:33 pm

Historical Building

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance.

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Dec 16, 2015, 4:05 pm

Baseline Construction Performance

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

When modelling the Baseline where the building is existing (not a new build) what is the procedure for selecting the baseline constructions in the model. This building is outside the US.

6
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Dec 16, 2015, 2:39 pm

Problem with FSC and COC shipped from other country.

NC-2009 MRc7:Certified Wood
posted by  Somsak Jidmon  on 

We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 - Certified Wood. We had looked and found the product of FSC label from China that we could use.

6
Senior Architect and LEED Consultant
GA Studio Co.,LTD.
LEEDuser Premium Member
1 thumbs up
Wed Dec 16, 2015, 3:29 am

Black Box Theater Occupancy and FTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Katherine Mariano  on 

Hi, Would anyone know how to treat the actors, artistic team, production team? Will they be treated as transients or FTE? Hope someone could shed some light on this Thank You

2
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Wed Dec 16, 2015, 2:27 am

Outdoor Seating for a Restaurant

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Gabriela Crespo  on 

Dear all, we have a multi-tenant project that includes restaurants, currently they have a smoking policy for outdoor seating, 1.is it possible to maintain the policy for outdoor smoking, if we comp

4
Tue Dec 15, 2015, 11:08 pm

Transients Again

NC-2009 PIf3:Occupant and Usage Data
posted by  Christopher Shaw  on 

I see many questions and answers on FTE's and visitors/transient, but none that quite makes it clear to me. So first, is the mail carrier who comes in once a day for oh 30 sec.

2
Tue Dec 15, 2015, 9:29 pm

Screw chillers

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Mehdi Kardehi  on 

Hi , There is no mention of screw chillers either under the credit EA 4 or ASHRAE application. I can only see absorption, scroll and reciprocating. Can someone please help me with the life span to

1
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Tue Dec 15, 2015, 8:48 pm

Lighting Controls Exemption

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Katherine Roth  on 

Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.

3
Tue Dec 15, 2015, 8:27 pm