Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy Performance : Automated Lightning and HVAC system

NC-2009 EAc1:Optimize Energy Performance
posted by  Marco Valerio Ceccotti  on 

We Desined a Dormitory Building ( NC ) already constructed and in operation. Each door of the bedrooms has a card reader connected to a BMS ( Building Management System ).

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Dec 18, 2015, 6:14 pm
3
Project Manager
A3C Collaborative Architecture
LEEDuser Basic Member
1 thumbs up
Fri Dec 18, 2015, 5:25 pm

A little clarity on the 14-day TVOC test

NC-v4 EQc2:Low emitting materials
posted by  Paula Melton  on 

A couple important bits of intel from my research in the last few days.

3
Director, Global Product Safety and Compliance
Steelcase Inc.
LEEDuser Basic Member
82 thumbs up
Fri Dec 18, 2015, 1:30 pm

Resort Hotel and Condo

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Zehren  on 

I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.

4
Default Avatar
Zehren and Associates
LEEDuser Basic Member
2 thumbs up
Fri Dec 18, 2015, 12:01 am

U-value for Green Roof using Appendix A

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We have a project where the proposed design includes a green roof, but there is no insulation. The roof has a metal deck below the green structure.

4
Thu Dec 17, 2015, 9:53 pm

Building Energy Metering - Third Party Source

CS-v4 EAp3:Building-level energy metering
posted by  Sean Hogan  on 

Hi, We have commenced a project seeking LEED V4 certification and wish to know more sharing metered information through third party sources.

5
Default Avatar
Energy Engineer
EBI Consulting
LEEDuser Basic Member
2 thumbs up
Thu Dec 17, 2015, 9:11 pm

Dedicated shuttle connecting to public transport interfaces

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Ricardo Sá  on 

I'm working on a project that is located approx. 0,75 mile from a bus interface, 1,6 mile from a train station and 2,6 mile from city centre.

5
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Thu Dec 17, 2015, 8:41 pm

Winter resort

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  John Zehren  on 

Our project is located in a winter ski resort village with heavy snowfall. The likelihood of someone biking here in the winter is slim.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 17, 2015, 4:53 pm

Carpet in LEED v4

NC-v4 EQc2:Low emitting materials
posted by  Ben Campbell  on 

Is it just me, or is there not much to work with in terms of compliant carpet for Low-Emitting Materials in LEED v4?

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Dec 17, 2015, 7:30 am

Hybrid Car Parking Shadin (structural and vegetation)

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Francis Porter  on 

Hi Everybody, I intended to meet SS 7.1 Heat Island Effect - Nonroof via Option 2 by covering all car parking spaces in vegetative shade.

8
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
LEEDuser Basic Member
10 thumbs up
Thu Dec 17, 2015, 6:41 am