Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Hi! I have a question regarding the ventilation requirement for the Linen Area, according to the Space Matrix file, there needs to be Outdoor air for this space.
Outside Mat
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Museum Exhibit Lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
I am modeling a museum with separately controlled exhibit lighting. I am using Section 9.6 of 90.1 2007 (space by space) to calculate my baseline general lighting power densities.
Waste Oil Fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
Perimeter protection
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Martin Meehan on
We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.
Base Build HVAC Plant Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
Hi, I am working on a CI 2009 fit out where the the landlord services such as heating pumps, boilers, AHU's and chillers are already installed.
SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.
Amount of offset in multi tenanted building
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Peter Doo on
If tenants are individually metered, are the percentages of offset calculated on common area meter usage only?
Minimum Benefit to Achieve ID Credits
posted by Aaron Smith on
Hello, It seems to me I read at some point in time that the CaGBC wanted to see a minimum measurable benefit for Innovative Strategies.