LEED Project Boundary, Concerned about Future Buildings...

NC-2009 PIf2:Project Summary Details
posted by  Rachel Manoguerra  on 

I registered a utility training center as an individual project on LEED Online, because at the time that was our understanding.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Mar 16, 2016, 3:23 am

ASHRAE 90.1 2007 vs 2013

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Wahjudi  on 

Hi all. Can we use latest standard of ASHRAE 90.1 2013 instead of 2007 as stipulated at reference guide? Noted that the latest standard will have more stringent requirement.

4
Wed Mar 16, 2016, 1:59 am

Two Commissioning Agency

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Steve Valev  on 

We are documenting a project where a roof-mounted PV system was installed after the building was occupied and the original commissioning process was complete.

3
Mon Mar 14, 2016, 10:22 pm

minimum drawdown rate

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  ethan adams  on 

OK it seems like, from reading the questions and responses here, that there is absolutely no clear guidance on how to come up with the "rainfall interval event" in order to perform the drawdown cal

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Mar 14, 2016, 8:29 pm

Items that are used for either MRc4 or MRc3

NC-2009 MRc4:Recycled Content
posted by  Erika Duran  on 

Dear All, I am unclear about something. If I have items that would qualify for MRc3 but we are not pursuing that credit, is it acceptable to count them towards MRc4?

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 14, 2016, 6:37 pm

Re-commisioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  John Wood  on 

I am a PE who has been approached by a building owner with a request to have the building "re-commissioned." I have designed LEED projects before, and participated in the original commissioning, b

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Mar 14, 2016, 6:15 pm

Cx Authority

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Giuseppe Medeghini  on 

LEED manual states that: "The commissioning agent must demonstrate experience on two prior projects." the two project have to be LEED certified or they can be even no certified but with similar siz

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 14, 2016, 6:14 pm

'..with no air recirculation' is for exhaust system or AC system

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Qiao LIANG  on 

LEED v3 reference guide has mentioned that 'the exhaust rate must be at least 0.5 cfm per square foot, with no air recirculation'..does it mean exhaust system or AC system???

2
Mon Mar 14, 2016, 1:56 pm

Calculator Password

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Caroline Shannon de Cristo  on 

Is it possible to access the Indoor Water Use Reduction Calculator Excel file without a password? What password is this asking for?

2
Fri Mar 11, 2016, 6:37 pm

Shopping mall

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Miriam Ramirez Baumgarten  on 

Hi, we have a project where the first 4 floors are retail (shopping center, including bowling and movie theatres). Because of the design of the shopping mall, most retail spaces do not have views

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Mar 11, 2016, 3:23 pm