Forum quick links
Building height calculatons
Pilot-Credits SSpc55:Bird collision deterrenceposted by Brian Harris on
If a building is on a sloped site, and therefore the building height varies from one facade to the next, how shall the building height be determined relative to the BCTF spreadsheet?
Engineered Natural Ventilation with Ceiling Fan
NC-2009 IEQp1:Minimum IAQ Performanceposted by James Lee on
Hi, I have a lobby which has one side is open to outside. But the length of lobby is almost 40ft instead of 25ft. And their are 8 ceiling fans evenly.
Residential building
posted by Ana Paula Quiros on
We have a residential building looking for certification. Which rating system would be more appropiate? New Construction or Core& Shell? Many thanks
Alternative calculation for MRc2
NC-2009 MRc2:Construction Waste Managementposted by Marcia Weekes on
It has come to my attention that in my local market, most if not all waste management companies use visual inspections to determine recycling rates for commingled loads.
conductive rubber flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lyle Axelarris on
In the past, we've used FloorScore-certified Static Dissipative rubber Tiling for Comm rooms. The client is now asking for conductive rubber flooring instead of dissipative.
10% Exemption
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Elizabeth Felder on
Hello, If we are exempting a retail space from this credit, would the property need to install walk off mats from the retail door into into the building, or would the whole area be exempt, includi
Separate Demolition Package from Construction Package
NC-2009 MRc2:Construction Waste Managementposted by Margaret Montgomery on
I saw a comment from several years ago that appears not to have been answered; a response would be useful to me now! Can anyone address this question?
Mastersite scorecard Construction Review
posted by Susannah Goddard on
My project is a Campus project. All of the credits sought on the Mastersite scorecard are "Awarded" after Final Design Review (and appeal in some cases). What do I do now?
Density Calc which includes Marinas
NC-2009 SSc2:Development Density and Community Connectivityposted by Michelle Rosenberger on
Our high rise apartment building is located in a fairly dense urban area. The project team felt pretty confident that we could make ID level density.
Data center cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have both space cooling and in rack chilled water cooling for computers. I wonder if the in-rack cooling is considered as process load or not.