Forum quick links
ventilation levels
NC-2009 EAp2:Minimum Energy Performanceposted by Tristan Roberts on
I got this question via email and thought I would post it here for your help. Thanks!
3 LEED projects sitting on a parking & retail layer cake
NC-2009 MRc4:Recycled Contentposted by Susan Di Giulio on
Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects.
Bike Racks Calculation for the 1928456ft2 Rapid Train Station
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Orçun Özhelvaci on
Dear All, We have confronted with 1 complicated issue regarding Bike Rack numbers. The gross floor area 1.928.456 ft2 Rapid Train Station with its Hotel, Restaurant and Mall.
REVIT 2016 Daylight Analysis Tool not acceptable?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Deborah Lucking on
We submitted for this credit using the results from the REVIT 2016 daylight analysis tool.
Residential Requirements
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Brightworks Sustainability on
Hi all, I am working on a graduate housing project that is all residential, and some apartments have doors directly to the outdoors. What are the walk-off mat alternate requirements in this case?
Drop irrigation only when needed
CS-2009 WEc1:Water Efficient Landscapingposted by Mathilda Jonsson on
I have a similar quesion as Alicja Bieszyńska, had above. Our project will contain offices and a pre-school facility. Two adjacent building contains homes. These buildings will share a large yard.
Multi-Family Buildings with Non-Residential Entrances
ND-v2009 NPDc9:Access to civic and public spaceposted by Sara Zoumbaris on
Hi, we have a site with several multi-use buildings which have non-residential entrances and a main entrance which will lead to residential lobby etc.
Fire Station FTE
NC-2009 PIf3:Occupant and Usage Dataposted by Deborah Morgan on
I have a fire station that will have 9 fire fighters working 24-hour shifts. 1.
Baseline HVAC for Major Renovation keeping existing chiller
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Isabel Conde on
Hi, we are working on a project for which our client would like to pursue a Major Renovation certification. All air handlers will be replaced.
Alternative Compliance for M&V
NC-2009 EAc5:Measurement and Verificationposted by Deborah Lucking on
All, our project is a large and complex convention center remodel/expansion. We are proposing a metering strategy that is tailored to the way the building will be operated.