interpolation
NC-v4 LTc5:Access to quality transitposted by sepideh khodadadi on
hi guys i have a question i'd be happy if you can help me with it our project is around 850 meters far from a crowded subway station that can help us achieve up to 5 points but since the distance
10% exemption
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that doesn't hav
Baseline HVAC System Selection
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I have a LEED project that is split up into 3 separate blocks. Each block is made up of mainly office space. On the ground floor there is retail units.
confusion in language with scope
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Courtney Royal on
In the above "Checklist" tab it states the following language: Commercial Interiors projects must include in the water-use calculations any water fixtures that are being used by occupants, even if
URGENT - Eligibility Advice needed right away!
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Erica Downs on
If anyone can, I need an answer ASAP -- The project will be a new-construction Concrete Manufacturing Plant.
NC Credit IEQ 8.2-Views Maintenance Shop
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Leslee Randolph on
I am working in V2009 (post 2014).
Requirements in Credit Compliance Guidance vs. Redline?
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Jareb Ketay on
Starting to see more and more of this as we get deeper into recertifications. In the Recertification Guidance document, on page 17 (Credit Compliance Guidance section), performance requirements ar
Perimeter Zones Requirements for Warehouse
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a large warehouse project, which is an open space with the area of 10,000 square meter. This project is targeting at LEED 2009.
Signage for Each Space
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Neumann Monson on
Is it possible to sign a bank of parking spaces in lieu of signing each space individually? If signing a bank with arrows, how far or how many spaces are acceptable.
Which ASHRAE & LEED should I base my simulation on?
NC-2009 EAp2:Minimum Energy Performanceposted by Olaf Dybinski on
Hello, I have a problem with choosing a basis for my simulation. I have a building that was designed in 2015 and is about to be build.