Forum quick links
Pilot ACP versus credit
Pilot-Credits MRpc102:Legal Woodposted by Jens Apel on
Just to make dead sure my understanding is correct: The first line in the box under requirements here http://www.usgbc.org/node/10146311?view=language does mean, that a BD+C NC (v2009) project can
HUD DDA Designation
NC-v4 LTc3:High priority siteposted by Nathan Gauthier on
Can any project get this credit if they're in a DDA area? It seems like the DDA only exists to identify areas where additional subsidy is needed for low-income housing.
Drop-off area
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Charlie Popeck on
Can the drop off area be a designated parking space?
ACP and Regional Priority
NC-2009 RPc1:Regional Priorityposted by Joanna Jenkins on
I suspect I know the answer to this, but I'm wondering if others have any experience with earning Regional Priority points having used an Alternate Compliance Path.
"Box" within an exisiting Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Gina Dederer on
Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b
Misc. loads entry in the simulation software
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding Misc.
Eye Wash Basins in a Lab
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Aru Sau on
Would a Eye Wash Basin in a Laboratory be considered as Process Water and should not be included in the credit calculation?
carpet
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Pablo Fortunato Suarez on
This is related to the previous query. I see no reference to certification from the Carpet and Rug Institute which was present in v3.
Documentation: calculating grey water and rainfall - irrigation
NC-2009 WEc1:Water Efficient Landscapingposted by John Covello on
Hello Everyone, I am seeking further clarifications and suggestions regarding the clacuation for the use of grey water for irrigation and rainwater for our project.
Confusion over adjacency and shared systems
NC-v4 MPR2:Must use reasonable LEED boundariesposted by GBD Architects on
Hi all, We are looking to certify a new childcare building on a higher-ed campus that will be sharing HVAC systems with an existing childcare building.