Forum quick links
owner/tenant contract
CS-2009 EAc6:Green Powerposted by FABIO VIERO on
Hi all, we are working on a shell&core project that, once completed, will be a single tenant occupied buiding.
Rooms designed with no windows, but still part of ROA
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Korinkova on
Are there any areas that can be exempt from dayligting calculations, while still being part of ROA?
advanced buildings doc
posted by Tristan Roberts on
Joshua, not sure what to say... I can't find a copy either. It's not a resource we have referenced on this site, and I'm not familiar with it.
Daylight Sample
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Alex Barrera on
Hello, is there a filled out sample of the Daylight/Views calculator Spreadsheet anywhere? I'm using the prescriptive method to conduct the Daylight calcs.
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Helene Lefkowitz on
Are CSRs required simply for manufacturer's (a blanket report that encompasses all products made by a particular manufacturer), or are CSRs required for each individual product?
Rooms to be considered for IEQ C5
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on
I am working on a project which attempts for IEQ C5. When listing the list of rooms to be considered for credit compliance as per LEED V3 (i.e.
Motor efficiency in 50Hz countries
NC-v4 EAp2:Minimum energy performanceposted by André Harms on
In response to the ASHRAE 90.1:2007 mandatory requirements for the efficiency of 60Hz motors, some had used the European IE2 standard for 50Hz motors and demonstrated equivalency.
language
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by jorge calderon on
Since all the visitors to our project speaks Spanish, I wonder if is accepted to meet this credit that signage be written in Spanish?
Sourcing of Raw Materials reporting requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christine Subasic on
How specific does the location disclosure have to be for the raw material supplier extraction locations? I have a client concerned about revealing proprietary information.
Data Center CxA
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha