Forum quick links
IAQ calculator v03
CI-2009 IEQp1:Minimum IAQ Performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
IAQ calculator v03
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
Galvanize Repair
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Sean Kirk on
Hello, My project contains interior galvanized steel which will need repairing during installation.
light density in wellness center
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
What space type shall be considered for a wellness center (e.g.
Zone Air Distribution Effectiveness
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In the office the air (cold in summer, warm in winter) is both wall supplied and ceiling supplied. The air is exhausted from the WCs.
Garbage Truck Maintenance Garage
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by FTE employees, can I still consider those parking spaces for Option 2?
VOC Content
NC-v4 EQc2:Low emitting materialsposted by Catherine Blakemore on
Hi I am just becoming aquainted with the Low-Emitting Materials Calculator.
proposed model fan power
CS-2009 EAp2:Minimum Energy Performanceposted by jack evans on
We have received our Design Final Review comments and the LEED reviewer has denied EAp2 because the proposed equipment capacities do not match the equipment schedules on the HVAC drawings.
Design Build Projects
NC-v4 IPc1:Integrative processposted by Michelle Rosenberger on
Our region primarily uses design build which means that there are two very separate Schematic Design processes for our projects.
Company providing Shuttle to Train Station
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
A warehouse / distribution center facility just bought a shuttle to transport employees to / from train station (more than 2 miles away.) We understand this doesn't meet the intent of SSc4.1, but i