College Campus, mixed use buildings, and public accessibility

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Erica Downs  on 

We are attempting Op. 2: Community Connectivity on a college campus. We have plenty of services on campus that are open to the general public to meet the requirements.

3
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Thu May 11, 2017, 2:54 pm

Campus application

NC-v4 SSc4:Rainwater management
posted by  Rob Hink  on 

Our LEED project site falls within a larger medical campus which has a campus-wide stormwater management plan which meets the credit requirements.

3
Thu May 11, 2017, 2:36 pm

basecase System

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear Concern:- Greetings Our project is G+5 but A/c spaces are located in 3 Floors only and A/c area is totally below 10000 Square feet only (electrical heating only) so we have some queries in

5
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Thu May 11, 2017, 7:06 am

Additional Flush-out Duration after Air Test Failed

Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Kim Lombard  on 

If Option 2 for an air test fails, the remedy is .... "....conduct an additional flush-out with outside air and retest the noncompliant concentrations. Repeat until all requirements are met.

2
Wed May 10, 2017, 6:50 pm

Average ADC%

NC-v4 MRc5:Construction and demolition waste management
posted by  Michelle Rosenberger  on 

The tracking form is now asking for average ADC produced by the sorting facility. This isn't part of the reporting we get from them. Is this optional?

4
Default Avatar
LEEDuser Expert
472 thumbs up
Tue May 9, 2017, 10:57 pm

Services on campus

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Lauren Sparandara  on 

We recently received a review comment that said that we could not count the services located on our university campus and freely available to all of our project's FTE.

3
Default Avatar
Designer/Draftsperson
CAW Architects
LEEDuser Basic Member
4 thumbs up
Tue May 9, 2017, 8:34 pm

residence scenario emission test

Homes-v4 EQc7:Low-emitting products
posted by  Danielle McMahon  on 

Would an Greenguard Gold certified adhesive product eligible for the LEED v4 Home low-emission credit? In other words, if a product claim that they've performed the emission evaluation test that i

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue May 9, 2017, 5:29 pm

Solvent Cement Adhesive for PVC pipes

NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are trying to find a specific adhesive for PVC pipes.

3
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Tue May 9, 2017, 4:18 pm

LEED CS 2009 Existing Equipment

CS-2009 EAp2:Minimum Energy Performance
posted by  Lorey Flick  on 

could you clarify something for me: Existing HVAC equipment: 1. If it's not touched it may be used identically in the baseline and proposed case. 2.

9
Tue May 9, 2017, 1:36 pm

Conformity of commingled facility process

NC-v4 MRc5:Construction and demolition waste management
posted by  William Leblanc  on 

The commingled waste facility that process our project waste work as follows: They weight the container once it arrives from job site, then separate the diffents matrials into percentage of the loa

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Mon May 8, 2017, 5:27 pm