CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by David Lazaro on
Hi, Our project is in the city centre, in one of the main business areas, close to many services and transport connections. We have no space on the ground-level to store bicycles (it is a zero-lot
Parks that are protected for a limited amount of time
NC-v4 LTc4:Surrounding density and diverse usesposted by Ashley Hu on
Hello everyone, Would a park that is protected from development for 10 years be considered unbuildable land? Thank you in advance!
Heat Island Reduction when adjacent to existing building on lot
CS-v4 SSc5:Heat island reductionposted by Nadia Bini on
Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?
Natural Ventilation modeling question
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello! An educational building will have no AA for its classroom, workshops and labs (mainly 90% of the project area), as all these areas will be naturally ventilated (complying with section 5.1 o
Number of CO2 Sensors
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Subramaniam Chandrasekaran on
regarding the number of CO2 sensors, I have the following query; requesting for advice; do we have to install - 1. one CO2 sensor for every 1000 sqft 2.
Warehouses & EV Charging stations on parking
NC-v4 LTc8:Green vehiclesposted by Charline SEYTIER on
Dear all, we are currently working on a LEED Warehouses project including also some offices and a parking area.
Requirement (k). Elevated ground-floor dwelling units
ND-Plan-v4 NPDc1:Walkable streetsposted by Noriko Nagazumi on
Hi, Our project doesn't have any ground-floor dwelling units. In this case, the project can achieve this requirement or not? We appreciate any instruction in advance. Thank you.
Brownfield
CS-v4 LTc3:High priority siteposted by Antonio Macedo Filho on
Hi Tristan, I have a project in a Brownfield. The site had a fuel station for boats before, and on the new project the owner will keep one fuel station, but now, it will be underground.
Baselin Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is: