Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to deal with certified existing building?

ND-v2009 GIBc1:Certified green buildings
posted by  Noriko Nagazumi  on 

Hi, We have a project which has 1 existing building and more than 10 new constructions within ND boundary. We are confused in calculation for GIBc1 Option 2.

1
Thu Jun 15, 2017, 8:20 pm

Paints Low Emissions

CI-v4 EQc2:Low emitting materials
posted by  Gabriela Mena   on 

Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc

1
Sat Aug 26, 2017, 8:04 pm

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased Ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am

Crawlspace and Attic Classification

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Chappell  on 

I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.

1
Fri Jun 16, 2017, 7:26 am

Monitoring requirements - Naturally ventilated residential units

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Mario S.  on 

We are working on a residential building where split AC units are provided in every room for each unit with no mechanical ventilation.

1
Thu Aug 31, 2017, 1:00 am

LEEDv4 Homes - Parking Structure

Homes-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sara Greenwood  on 

It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl

1
Tue Jun 20, 2017, 3:11 pm

LEED EBOM v4 Registration, Certification & Performance Period

Performance Period
posted by  Amy Green  on 

Want to create a clear schedule for how long certification for an EBOM project will take and what critical deadlines need to be met such as if you have to register or certify for LEED EBOM within a

1
Tue Sep 12, 2017, 12:08 am

Purchased energy rate

CS-v4 EAp2:Minimum energy performance
posted by  Shenhao Li  on 

Hi all, We have a LEED v4 CS project which use purchased chilled water and purchased heat.

1
Mon Jun 19, 2017, 1:28 pm

VRV in Table 1.4

CS-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Hello, I am filling out the Table 1.4 for an office building with mutiple tenants, and each tenant has a separate VRV to serve their space.

1
Mon Jun 19, 2017, 1:37 pm

Previously developed - however 40 years ago

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Samuel Sura  on 

Hi, We are trying to determine if a site that has historically been developed, however all buildings have been removed approx. 40 years ago can be considered previously developed.

1
Sat Aug 26, 2017, 11:08 pm