LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Campus DES definition
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Luis Huertas on
While reading the definition in the District or Campus Guidance on what is a DES, it is not clear as whether one can consider each energy source an isolated DES or all the energy sources aggregate
25% vegetated requirement and accesibility
NC-v4 SSc3:Open spaceposted by Mercè Llorca on
I've been wondering if when the credit ask for vegetated área, it would be enough to take the 25% from the 30% required área or, if the project has larger outdoor space than 30%, the requirement fo
Core & Shell Retrofit
CS-v4 SSc1:Site assessmentposted by Juliana Malho on
I'm wondering if the credit is achievable by retrofit projects.
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Madushan Samarakoon on
I am working with a data center project which have 3 floors but air conditioned area is less than 25000 sqft. But total area is exceeding 25000 sqft with unconditioned toilets and corridors.
Lumens emitted at or 90 degrees from nadir
NC-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
Hello, When calculating the number of lumens emitted at or above 90 degrees from nadir, is it possible to disregard the lumens that are shielded by the building its self / are not emmited directly
Natural Ventilation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by SAMY Chamy on
Dear Concern:- Our project does not have any A/c spaces and Equipments So we dont use any Refrigerants so can we claim this credit Is there any CIR available for this situation Dut to the non u
PPA as renewable energy production?
CS-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.
MRpc112 - Certified Multi-attribute Products and Materials
CI-2009 IDc1:Innovation in Designposted by Maki San Miguel Paulson on
We have registered for this Pilot credit, but I don't understand the credit language. We have Level 3 BIFMA certified product (Knoll furniture) which is worth about 12% of the total product cost.
Local Ordinance prompts pkg improvements outside LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alicia Ponce on
Our project is an Addition that will sit North of an existing school. Our LEED project scope does not include the existing building nor the existing parking lot to the south.