Forum quick links
Adhesive for acoustic insulation on ventilation instalation
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Andrzej Gutowski on
Doea anyone could advise what category of adhesive would be that? Would that be up to material used for acoustic insulation?
Horizontal and vertical footcandles documentation
CS-2009 SSc8:Light Pollution Reductionposted by Anna Korinkova on
Hello, I have a question regarding the horizontal and vertical footcandles. In our understanding, the horizontal footcadle means that the illuminaiton is measured at horizontal plane (i.e.
Glisofat
EBOM-v4 SSc5:Site managementposted by Emmanuel Pauwels on
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?
Stores ventilated with air from common areas in a mall?
CS-v4 EQp1:Minimum indoor air quality performanceposted by Billy Condor on
Hello, I'm the CxA and energy modeler for a new big C&S v4 mall project.
Project size increase
CS-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.
When covering a wide range of products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
A company is planning to publish an EPD(s) for their gypsum board products.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
Parametric Rotation Runs for Baseline model of Existing Building
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
Since the energy model is based off of an existing building.