Forum quick links
Outdoor air delivery monitoring system for evaporative cooler
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Gopinath Vasu on
For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo
Atrium with reception desk
CS-v4 EQc4:Daylightposted by Martin K on
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Process water and residential units
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Our project includes a community center and a multi-residential part.
Active freight rail
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Yong Lee Low on
Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane.
Different CxA for Construction other than one hired duringDesign
CS-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th
Alternative Compliance Path
CS-2009 EAc1:Optimize Energy Performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the