Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Outdoor air delivery monitoring system for evaporative cooler

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Gopinath Vasu  on 

For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo

1
Wed May 31, 2017, 1:44 pm

Atrium with reception desk

CS-v4 EQc4:Daylight
posted by  Martin K  on 

Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.

0

Over limit adhesive used while building is open

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jayme Antolik  on 

I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.

1
Fri Jun 2, 2017, 12:47 pm

Process water and residential units

NC-v4 WEp2:Indoor water use reduction
posted by  MAUDE PINTAL  on 

Our project includes a community center and a multi-residential part.

0

Active freight rail

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Yong Lee Low  on 

Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane.

1
Sat Aug 26, 2017, 2:09 pm

Different CxA for Construction other than one hired duringDesign

CS-v4 EAc1:Enhanced commissioning
posted by  mohammad Hassan  on 

Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?

1
Wed Aug 16, 2017, 12:18 am

Acoustic performance: reverberation time

NC-v4 EQc9:Acoustic performance
posted by  alessandro santuari  on 

Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks

1
Tue Sep 26, 2023, 2:25 pm

Airport Terminal LEED certification

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  KONSTANTINOS VAVALETSKOS  on 

In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?

1
Sat Aug 26, 2017, 9:06 pm

Alternative Compliance Path

NC-v4 EAc2:Optimize energy performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th

1
Thu Jun 1, 2017, 6:19 pm

Alternative Compliance Path

CS-2009 EAc1:Optimize Energy Performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the

1
Thu Jun 1, 2017, 6:35 pm