Forum quick links
Existing Equipment
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The 90.1-2010 User's Manual states: "In some cases, a complete HVAC system already exists (...) the proposed building and baseline building models are the same and are based on the existing HVAC sy
Confirm the percentage of wastewater treated on-site definition
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Jing Hong on
Trying to confirm couple of terms in WEc2, yes or no questions: 1.
Motorcycle Parking Under Cover
NC-v4 LTc7:Reduced parking footprintposted by Dana Waters on
Can you please help to clarify? What if the motorcycle parking is under cover of a shade structure?
Example narrative using local standards and codes
Schools-2009 SSp1:Construction Activity Pollution Preventionposted by Dennis Palmer on
Does anyone have a sample of the verbage they have used for the SSp1 Prereq using local standards and codes?
Commercial Air Fresheners
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Annelies Hodge on
We have been asked to use a commercial air freshener which diffuses aromatic oils to create a 'nice smell' in our LEED EBOM Platinum Building.
residents of Multi-residential project
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Yan-Chuan Chen on
Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?
Cold Dark Shell - M&V Question
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Brightworks Sustainability on
I'm working on a cold dark shell project where the tenant will be building out the full HVAC and BMS system.
Space Type
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saif Abdulameer on
Hello, I am working on school that has a study area, a lounge and common area as a part of a vestibule that leads to the outside or a corridor that connects classrooms.
Entryways Only
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Rosenberger on
Can a Core & Shell building with only restrooms built out that has only exhaust fans and gas fired freeze protection units comply with this credit?
Integrative Process-Simple box C&S v4
CS-v4 IPc1:Integrative processposted by Giuseppina Amorusi on
Hi all, I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification. We have an existing building where we will do