Forum quick links
Can this credit be achieved if no minimum local code requirement
CI-v4 LTc5:Reduced parking footprintposted by Juliana Moreira on
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.
Offsite donation compensation
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
I have a project with a large previously developed area.
Occupancy from areas not in LEED scope
CS-2009 PIf3:Occupant and Usage Dataposted by David Lazaro on
Hello, We are certifying a building which has undergone a major renovation above grade.
How to apply base ratios for non-specified usage type?
CI-v4 LTc5:Reduced parking footprintposted by Jonathan Weiss on
For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
Quality Assurance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Can anyone help with the following LEED reviewer comment that we received.
LEED V4 -Healthcare Or NC
posted by DON JUNIOR on
I am part of a team, trying to decide on which rating system to use for a new construction project. Our project is a hospital outside US (located in Middle East).
Conditions for site fence
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Projects constructed by diferent owners, same property managment
posted by Pedro Urazan on
Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.
Increasing certification level after accepting certification?
posted by Tommy Linstroth on
Is it possible to improve your certification level after accepting final certification?