Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can this credit be achieved if no minimum local code requirement

CI-v4 LTc5:Reduced parking footprint
posted by  Juliana Moreira  on 

I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.

1
Mon Aug 28, 2017, 5:50 am

Offsite donation compensation

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Cesar Ruiz  on 

I have a project with a large previously developed area.

1
Thu Apr 27, 2017, 6:29 pm

Occupancy from areas not in LEED scope

CS-2009 PIf3:Occupant and Usage Data
posted by  David Lazaro  on 

Hello, We are certifying a building which has undergone a major renovation above grade.

1
Wed Apr 26, 2017, 8:13 pm

How to apply base ratios for non-specified usage type?

CI-v4 LTc5:Reduced parking footprint
posted by  Jonathan Weiss  on 

For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.

1
Thu Sep 7, 2017, 4:17 pm

Account for local and utility central energy plants

NC-v4 EAp2:Minimum energy performance
posted by  S. Sachs  on 

We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.

1
Wed Apr 26, 2017, 10:49 pm

Quality Assurance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Can anyone help with the following LEED reviewer comment that we received.

1
Thu Apr 27, 2017, 1:08 pm

LEED V4 -Healthcare Or NC

LEED Rating System Selection
posted by  DON JUNIOR  on 

I am part of a team, trying to decide on which rating system to use for a new construction project. Our project is a hospital outside US (located in Middle East).

1
Fri May 5, 2017, 4:28 pm

Conditions for site fence

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Julian Bork  on 

Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th

1
Sat Aug 26, 2017, 2:12 pm

Projects constructed by diferent owners, same property managment

LEED Guidance for Campuses and Multiple Buildings
posted by  Pedro Urazan  on 

Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.

1
Fri May 5, 2017, 10:07 pm

Increasing certification level after accepting certification?

General forums
posted by  Tommy Linstroth  on 

Is it possible to improve your certification level after accepting final certification?

1
Thu Apr 27, 2017, 8:58 pm