posted by  Omer Moltay  on 

Hi, The credit language is confusing for us. Some on the project team think that the credit is asking for at least one functional entry on every facade that faces a public space.

0

Walkable Streets: Sidewalk Width

ND-v2009 NPDp1:Walkable streets
posted by  Aaron Ryan  on 

Our project has a block in which each block face is lined with townhouses or multi-family buildings. On one corner is a mixed-use building.

0

Building height to street width ratio calculation

ND-v2009 NPDp1:Walkable streets
posted by  Tyler Baker  on 

Hi, Our project is LEED pre-certified plan, with some single detached houses.

0

Front lawn sidewalk width

ND-v2009 NPDp1:Walkable streets
posted by  Colin Day  on 

Hi Eliot, Our project has entry walks leading from public sidewalks to front doors that are slated to be 3 feet wide.

0

Internal streets

ND-v2009 NPDp1:Walkable streets
posted by  Sarah Michelman  on 

If a proposed development project site is located on two city blocks on either side of a major existing through street and this is the only street within the project, can the development be conside

0

Building Frontage

ND-v2009 NPDp1:Walkable streets
posted by  Tommy Linstroth  on 

Our project is a 100% gut rehab of existing attached townhomes.

0

Continuous sidewalks for industrial use street

ND-v2009 NPDp1:Walkable streets
posted by  Noriko Nagazumi  on 

Hi there! The reference guide says: "Continuous sidewalks or equivalent all-weather provisions for walking are provided along both sides of 90% of streets or frontage within the project, includin

0

Ratio 1:3

ND-v2009 NPDp1:Walkable streets
posted by  Diana Nezamutinova  on 

Greetings, Eliot! Would you please be so kind to help with 4 questions below?

0

Breezeway Principal Functional Entry?

ND-v2009 NPDp1:Walkable streets
posted by  Tommy Linstroth  on 

Just hoping for a clarification/second opinion. Our project features 2-3 story walkup apartments that are access by central breezeways.

0

Parking Garage

ND-v2009 NPDp1:Walkable streets
posted by  Susann Geithner  on 

We have a parking garage attached to an office building. The office building is on a public street, so is the garage. So the building is between two streets.