Cx plan

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Joshua Roy  on 

Does anyone have an example Cx plan?

1
Fri Feb 17, 2017, 6:23 pm

randomly selected employees

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Hatice G.  on 

Hi, our building s located in Germany. We choosed Option 3 Approach 2. We ordered a company to do the survey.

1
Fri Feb 10, 2017, 3:41 pm

Baseline Pumping Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.

1
Thu Feb 9, 2017, 1:06 pm

Baseline Pumping Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.

1
Thu Feb 9, 2017, 1:03 pm

Use of C&S Commissioning documentation

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Izabela Kwiecinska  on 

Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.

1
Fri Feb 10, 2017, 8:56 pm

Floor Coatings Compliance with IEQc4.3 in LEED 2009

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Mario S.  on 

We have a concrete floor, and we plan on putting a coating on top of the concrete finish.

1
Fri Feb 10, 2017, 7:05 pm

Humidifier / Economizer / Energy Recovery

CS-2009 EAp2:Minimum Energy Performance
posted by  Samuel Sura  on 

Hi, I would like to ask 3 simple questions: 1) if a humidifier in proposed AHU is presented, can it be considered as a process load and thus modeled in baseline?

1
Fri Feb 10, 2017, 6:11 pm

Energy and Atmosphere credit #5

NC-2009 EAc5:Measurement and Verification
posted by  James Goldfield  on 

I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.

1
Fri Feb 10, 2017, 7:06 pm

Prefinished wood flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Brianna Brandsen  on 

when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site

1
Fri Feb 10, 2017, 7:02 pm

Total Site Area within LEED Project Boundary

NC-2009 PIf2:Project Summary Details
posted by  Sara Goenner Curlee  on 

I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?

1
Fri Feb 10, 2017, 9:38 pm