Forum quick links
Documents Required For pre-certification for LEED V4 Core Shell
CS-v4 MPR1:Must be in a permanent location on existing landposted by Aqrab Ali Rana on
I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an
IAQ Management Plan during Construction
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Marge Barradas Machin on
Dear all, According to your experience, how often would inspections should take place?
Resin floor
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Martin Meehan on
Would a resin floor be considered a floor coating (under IEQc4.2 and controlled VOC content), or a polymeric flooring system (under IEQc4.3 and controlled emissions)? I find that according to the
ERV supply and return fans
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have grouped many conditioned zones which the OA will be supplied with central DOA and ERV system. The air from the ERV will be deliver by large fan and return by also a large fan.
Primer for Waterproofing membrane
NC-v4 EQc2:Low emitting materialsposted by Leanne Conrad on
In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a
diverse uses
NC-v4 LTc4:Surrounding density and diverse usesposted by sepideh khodadadi on
our project is a big shopping center with almost all the diverse uses (such as restaurant,bank,etc.) can that help us get the credit without calculating the surrounding diverse uses?
SMACNA Ductwork Protection Guidelines
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Ciaran McCabe on
In order to qualify for this credit is it acceptable if the duct work is wrapped once it arrived on site OR should it arrive pre-wrapped.
asphalt impregnated felt underlayment for under wood floor
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
off-gassing of asphalt impregnated felt underlayment for under wood floor. Does anyone have any documented info indicating problems with off-gassing of asphalt impregnated felt underlayment for un
Change form
NC-2009 EAp2:Minimum Energy Performanceposted by Nicolas Martinez Ochoa on
Hi, I am working in an office building. I have completed the “minimum energy performance v2009” spreadsheet, but the project uses the v05 form. Is it possible to change the form to a newer form?
LEED exercise with in a project
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Tota Yun on
We are now 30% construction on a new building, since I am new to LEED, how I can follow and learn LEED requirement, and pursue the ongoing LEED practices on site with contractors?