Forum quick links
Tenant with LEED ID&C Certification is moving spaces in building
CI-2009 PIf5:Previously LEED Certified Detailsposted by Summer Gorder on
If a tenant moves spaces within the same building, but would like to maintain their LEED ID&C certification, does anything transfer over to certify their new space?
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum Energy Performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Energy Submetering
EBOM-v4 EAc5:Advanced energy meteringposted by VISHESH AGARWAL on
I am working on EB Project in LEED V4. In V4 the advance sub-metering is required 1. Chilled water System: Chiller and Chilled water pumps 2.
Air Cooled Chiller Vs Water Cooled Chiller With Dry Air Cooler
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Has anyone any feedback in modelling either of these two chillers in a 90.1 Energy model.
Occupancy Category
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Meier Corporate Account on
I am working through the Minimum IAQ Performance calculator and I need a recommendation.... Our facility is 105,000 quare feet (ground level).
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
decorative allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Ron Dean on
we have a project with a led strip only for decorative purpose and not included in the luxes calculus. This led strip is located on the ceiling illuminating the roof.
Heat Island Reduction
EBOM-v4 SSc3:Heat island reductionposted by VISHESH AGARWAL on
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2
Tile finishes for flat roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
How is an area/square footage assigned to a tree?
NC-2009 WEc1:Water Efficient Landscapingposted by Tricia Loe on
I have a plaza with 32 trees, with each in their own tree grate. I am trying to determine how to input this vegetation type into the EPA WaterSense calculator.