Forum quick links
Exemplary Performance
Schools-2009 EAc6:Green Powerposted by Kevin Taterus on
LFS 2009 rating system - Our Owner on the project received a quote from a renewable energy provider that stated we could get three points total if we purchased 100% of the energy from renewable sou
Reporting through Energy Star Portfolio Manager
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Claudia Galvis on
How often does the Owner need to report the Utility data if using the Energy Star Portfolio Manager to comply with MRP6? The form says on a 'regular basis', but does this mean monthly?
greenfield or previously developed site?
NC-2009 SSc2:Development Density and Community Connectivityposted by Anastasia Makarenko on
Dear all, we cannot decide whether we should treat our site as previously developed or as a greenfield site. Hope anyone can help me with this.
Basic resource with many uses...
posted by Kath Williams on
Condensed version of LEED-EB: O&M that has proven to be useful in introducing O&M to potential facilities management clients, those just starting LEED-EBOM, and hopefully, will be a bridge
VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees Ce
Building Area Method - highlighting merchandise
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a building I have to use the Building Area Method (ASHRAE 90.1-2007, 9.5.1) because some calculations were already developed through that method and now changing the method would be complicated
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Thermal Barrier Tape and EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Webb on
I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.
Using pre-existing conditions as oppposed to existing conditions
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Mei Zhu on
SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de