Forum quick links
Average Leed Recycling percentage for a large ground up building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jamie Knoblock on
I was wondering if anyone would know what the average Leed recycling percentage is on a large ground up hospital on a construction site across the united states , thank you.
WEp1 calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Muriel Alvarez on
Dear Since I have a problem with BETA version for WEp1, the form did not calculated the percentage correctly, I´ve decided to use the v06 form calculator, well...
Metered Lav Faucets No More
CI-v4 WEp1:Indoor water use reductionposted by Michelle Rosenberger on
I posted this comment on the NC forum in addition to here because there haven't been any responses to questions posed on this forum.
UPLOAD GOOD LITERATURE
NC-2009 SSc1:Site Selectionposted by bojana kovacevic on
If someone has good literature ( with clearly defined part for required documentation) of all SS and MR Credits I would be so happy if he/she share it with me.... Best regards!
Campus and group
posted by Charalampos Giannikopoulos on
There are seven existing buildings on a site, all owned (the site and the buildings) by the same entity who leases the buildings to tenants.
New Residential Building
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We have completed the Energy Model for New Residential Building which will be located in India.
Heat pump water heater
CS-v4 EAc6:Enhanced refrigerant managementposted by Ammon Palmer on
We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.