Forum quick links
Project Site on a University Campus
Pilot-Credits PC14:Walkable Streetsposted by Michael Munn on
The project I’m working on is a new construction on a University campus.
Changes to Campus Boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by David Gibney on
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent.
Dormitory as support building
NC-2009 PIf2:Project Summary Detailsposted by ABDUL MUTHALIB MOHAMED on
We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified Woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
Existing Insulated Glass Units
CS-2009 EAp2:Minimum Energy Performanceposted by Donald Green on
We have an existing building whereby some of the existing glass will remain however we cannot determine what the thermal properties of the glass is because there is no documentation and the manufac
Fertilizer and Herbicide Use
EBOM-v4 SSp1:Site management policyposted by David ESPAGNET on
In the site Management Policy (and SSc5 Credit) soil testing requirement have been added since 2009.
Transfer Air for IEQp1 achievement
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
Hello, I'm currently working on a project of a huge supermarket. The building has warehouses and storage rooms.
Long-term bicycle storage, Bicycle maintenance program
Retail-CI-v4 LTc4:Bicycle facilitiesposted by Guillaume PAJOT on
Hi, I am working on a store located on the ground floor of a mall where the only space for long-term storage bicycle is a room located in the upper floor (accessible by the stairway with sufficien
Lighting Sales areas
Retail-CI-v4 EQc6:Interior lightingposted by Guillaume PAJOT on
Hi, I am working on a store where the sale area is composed of ligthing for furniture and ambiant lighting in ceiling.
Baseline Chilled water pumps - G3.1.3.10
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The standard states that the pump power must be 22 W/gpm. If the project has two chillers and primary secondary circuits, whereby there is on pump per chiller in the primary circuits and