Forum quick links
Option 1 - ASE and the 10% LEED requirement
CI-v4 EQc7:Daylightposted by Alain Brierley on
I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.
New Performance Periods Table upload
EBOM-2009 PIf4:Schedule and Overview Documentsposted by Trista Brown on
USGBC has been releasing new versions of the v2009 credit forms that are more streamlined, and one notable change is that they no longer include fields to identify the performance period. USGBC ha
green roof
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Rob Hink on
I'm doing a Core and Shell project with a different retail and restaurant spaces. the project has a lot of green roofs. What sort of calculations do I do to get this credit?
Building Relocation
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nativa Architecture on
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
Pump Performance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
Hi, We have 2 number domestic hot water return pumps (100 watts each). These are the only two pumps we are specifying within the scope of this fit-out.
SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Justin Oldfield on
Our core and shell project has chosen a roofing material compliant with SS 7.2.
Prescriptive Method of Documenting - Floor Area (per bay)
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael Haugh on
First off, I have had a very hard time finding information to help complete this Credit's documentation.
How to model electric wall heaters in PRM energy model
NC-2009 EAp2:Minimum Energy Performanceposted by Veronica Reed on
Hello, We are renovating a 1905 two-story small historical landmark building as a 12 room boutique hotel, thus cannot include HVAC systems due to planning and preservation restrictions, and the lo
Calibrated vs actual energy use
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Puteri Shireen Jahnkassim on
Dear all, What if the case is that the actual total energy use diverted only around 1 to 3 percent of the predicted energy during design? Is a calibrated energy simulation model still need by LEE