Forum quick links
EBOM recertification for SSc1 path
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by AtSite Inc on
It is still unclear to me what "ongoing tracking" means to be eligible for SSc1 when pursuing via an EBOM recertification.
FTE of hotel guests
NC-2009 PIf3:Occupant and Usage Dataposted by Rob Hink on
How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?
Zero Lot Line
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Omar Elrawy on
Dear all, I have a project with an underground parking within the whole LEED project boundary, and landscape work above the underground parking, all around the above-grade building. Du
Energy Update ballot
NC-2009 EAp2:Minimum Energy Performanceposted by Kathryn West on
when will the results of the ballot be posted?
lavatory faucet in a dormitory
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nelina Loiselle on
Hello, I am working on a Co-ed dormitory were all of the bathrooms will be residential with the exception of two single occupancy bathrooms on the ground floor.
EQc3.1 IAQ Construction during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kimo Steed on
We are building a new building with concrete precast wall and roof panels with a concrete slab-on-grade.
majority residential
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Courtney Royal on
Our project is a multifamily building with several common spaces on the cellar, main level, and top level of the building. However, majority of the building is apartment units.
Separation between patient and staff places of respite
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Emily Hope on
I am seeking clarification on where places of respite for staff and for patients should be located.
Modeling Protocol
ND-v4 GIBc2:Optimize building energy performanceposted by Martine Desbois on
Are the Modelling protocols the same under LEED NDv4 and LEED BD&C v4? Can we use the same protocol and results to satisfy the requirements of both rating systems?
Mixed-Mode Ventilation in Residential
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Brightworks Sustainability on
I'm working on a residential project hat has mixed-mode ventilation, partial mechanical and operable windows in units.