Forum quick links
Is waste heat district energy?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that use heat recovery chiller to recovery heat from the waste heat from a nearby data center.
IAQ Testing
posted by Roland Jones on
I have been asked to provide IAQ Testing for LDP, and am having trouble finding the distinctions between the normal pre-occupancy sampling for credit 3.2 and the during occupancy sampling of LDP.
Sub Metering of Service Hot Water (Domestic Hot Water)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.
Alternative Compliance Path
Schools-2009 SSp2:Environmental Site Assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.
Kitchen Supply AHU (For Make Up Air)
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
As part of a fit out I the only tenant AHU is for make up air in a Kitchen 2966.4 CFM Can anyone explain the approach to enter this is in LEED form.
Energy Recovery (G3.1.2.10)
CS-2009 EAp2:Minimum Energy Performanceposted by Andy Fouss on
The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u
Custom Walk-In Freezers and Refrigerators
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by David Hryvniak on
I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.
can hotels be included as 10 unit per acre requirement
NC-2009 SSc2:Development Density and Community Connectivityposted by Rob Hink on
I'm working on a very suburban site and was wondering if I can include a hotel as part of the minimum 10 unit per acre requirement?
net area vs gross area (simulation)
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Panagiota Dadinou on
Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.