Green Power - Carbon Offset
CI-2009 EAc4:Green Powerposted by Henry Mak on
Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
Core and Shell with Commercial Interiors.
posted by Ana Paula Quiros on
Hello, Is it possible to exclude the commercial area of a building to be certified as CS and then certify that commercial area as CI?
Zone Heights & Voids for 90.1 PRM
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
When modelling a building to the ASHRAE 90.1 PRM what conventions should be used in terms of room heights. Are floor voids and ceiling voids merged into the height of the rooms? Advise needed.
Aerator pantry sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by H. Group on
We are using the Kohler faucet with 1.5 gpm aerator for pantry sink, I asked the supplier for .5gpm aerator, he said lowest Kohler offers on this faucet is 1.5 gpm.
leed modelling software
NC-v4 EAp2:Minimum energy performanceposted by sam Alfassy on
We would like to know if Design builder is approved for leed credits EAp2 and EAc2. We understand that it is more versatile than eQuest. any thoughts? Thanks!
Limited access for inpatient units
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by Brian Pescod on
We're looking at this credit as a potential Innovation in Design for a Long-Term Care BD+C project.
Elevator Shafts in high rise condo
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Chris Wisniewski on
I am the HERS rater working on a 80+ story condominium high rise. It is intended to be a "smoking permitted" building. Some of the residential units have in-unit access to the elevators.
Declare Labeled Products
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Laci Hoskins on
Does the Declare program (and therefore products with Declare labels) fall under the "other USGBC approved programs" for meeting Option 1 for Material Ingredient Reporting?
parking demand vs 1000sf or vs employees
posted by Agnieszka Rylska on
We are working on a project that is a warehouse.