Partially demolished existing building
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Petra Hajná on
Our client has bought a lot with partially demolished existing building listed on national heritage fund list. So we need to preserve what has left - portion of exterior walls.
n/a
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
[Innovation Credit] Bicycle Alternative
Schools-EBOM-v4 INc1:Innovationposted by JOHN COOK on
Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.
[Innovation Credit] Bicycle Alternative
EBOM-v4 INc1:Innovationposted by JOHN COOK on
Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.
LEED C&S project on our LEED ND site
ND-v2009 GIBp1:Certified green buildingposted by Gwen Corrie on
We have an approx. 6 acre block for our ND project, on which we have an existing hotel and two new condo towers with a retail podium.
LEED Boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by ABDUL MUTHALIB MOHAMED on
I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.
n/a
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Anastasia Makarenko on
Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.
Is green space above underground parking previous or impervious?
NC-v4 SSc4:Rainwater managementposted by Valentin Grimaud on
Dear all, We are currently wondering what is th ruling in the case of an underground parking being below a green space area, which we would tend to account for in the pervious area contribution fo
Insulation of Piping Cast into Concrete
NC-2009 EAp2:Minimum Energy Performanceposted by André Harms on
We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i
25'-0" Max Footpath to Main Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Kelsey Jensen on
Our current project places the main staircase in view of the main lobby and corridor.