Forum quick links
Existing Blow-out toilets
CI-2009 WEc1:Water Use Reductionposted by Russell Philstrom on
Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
LEED for Homes MidRise and Commercial Condo Space
posted by Jennifer Preston on
First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.
LEED certification for part(s) of a hospital--op. rooms v. gar.?
Healthcare-v2009 PIf1:Minimum Program Requirementsposted by Robert Russo on
We are working with an existing hospital that would like to become LEED certified, but would like to LEED certify certain defined areas that are being renovated first--like the operating rooms.
Policy goals
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Charalampos Giannikopoulos on
Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre
Structures connected through a walkway
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Assesment rooms at rehabilitation Center
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.
Using microgrid battery storage to achieve demand response credi
Pilot-Credits EApc8:Demand responseposted by S. Sachs on
I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).