Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Existing Blow-out toilets

CI-2009 WEc1:Water Use Reduction
posted by  Russell Philstrom  on 

Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.

1
Wed Dec 30, 2015, 11:23 pm

Scope of the Pre-requisite in C&S Shopping mall

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.

1
Tue Jun 30, 2015, 8:19 pm

Scope in a C&S shopping mall

CS-2009 EAp2:Minimum Energy Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.

1
Fri Jun 19, 2015, 4:58 pm

LEED for Homes MidRise and Commercial Condo Space

LEED for Homes (LEED-H) Forum
posted by  Jennifer Preston  on 

First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.

1
Mon Jun 22, 2015, 1:39 pm

LEED certification for part(s) of a hospital--op. rooms v. gar.?

Healthcare-v2009 PIf1:Minimum Program Requirements
posted by  Robert Russo  on 

We are working with an existing hospital that would like to become LEED certified, but would like to LEED certify certain defined areas that are being renovated first--like the operating rooms.

1
Wed Dec 30, 2015, 5:49 pm

Policy goals

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Charalampos Giannikopoulos  on 

Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally pre

1
Mon Jun 29, 2015, 8:39 pm

Structures connected through a walkway

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.

0

Concrete Formwork

CS-2009 MRc5:Regional Materials
posted by  Mike Zupan  on 

Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!

1
Wed Jun 24, 2015, 11:53 pm

Assesment rooms at rehabilitation Center

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.

1
Fri Nov 27, 2015, 9:29 pm

Using microgrid battery storage to achieve demand response credi

Pilot-Credits EApc8:Demand response
posted by  S. Sachs  on 

I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).

1
Mon Mar 20, 2023, 8:55 pm