We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating. The other common, concourse and stores spaces are being designed and the project will be a C&S with the owner scope only in common and concourse areas. The tenant area that already exits is included in the scope of the LEED C&S certification, but is not in the scope of the owner. Should I demostrate compliance of this prerequisite for this are that is not in the owner scope? If so, Should I model this space even though is not in the owner scope with equipment that already exits? There is any way I may exclude this tenat in the scope of the C&S certification shopping mall, I mean do not consider that space in any credit? Thanks you! Dante Garcia
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.