For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Scope in a C&S shopping mall

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating. The other common, concourse and stores spaces are being designed and the project will be a C&S with the owner scope only in common and concourse areas. The tenant area that already exits is included in the scope of the LEED C&S certification, but is not in the scope of the owner. Should I demostrate compliance of this prerequisite for this are that is not in the owner scope? If so, Should I model this space even though is not in the owner scope with equipment that already exits? There is any way I may exclude this tenat in the scope of the C&S certification shopping mall, I mean do not consider that space in any credit? Thanks you! Dante Garcia

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 06/19/2015 - 16:58

If it is a separate project you can exclude it. See the MPR Guidance for the details on how to do so. http://www.usgbc.org/Docs/Archive/General/Docs6473.pdf

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.