Forum quick links
FSC Wood COC
NC-2009 MRc7:Certified Woodposted by Andy Prestridge on
We have received the FSC invoice for some of our FSC plywood and our subcontractor had it delivered to his shop a few miles away and then brought it to the site.
Tenants Obliged to Share Data with USGBC?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ian McCall on
Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?
Occupant Survey
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Teresa Farmer on
our project is a manufacturing plant. Do we conduct the occupant survey among the office employees or among the entire workforce as most of the employees are in the mfg portion of the building
Custodial Effectiveness Assessment
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Teresa Farmer on
our project is a manufacturing plant. Should we conduct the custodial effectiveness assessment in the office area or in the entire facility.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-Site Renewable Energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
Open space definition
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by sompoche sirichote on
My project is in the industrial area which allows building footprint not exceeding 66% of total site area.
water retention agent
NC-2009 WEc1:Water Efficient Landscapingposted by Renaud Gay on
Hi, I was wondering if anyone already used water retention agents added in the soil, such as acrylamide in any project and how this was documented. Thanks!
M&V Option 3 for Building Additions
NC-2009 EAc5:Measurement and Verificationposted by Mark Zoeteman on
If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv
Existing Central Plant serving new building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.
Portable Air Conditioning.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Carla Lopez on
Dear all, For an office building project we will be using a PORTABLE AIR CONDITIONER to cool the IT room; the unit has a cooling capacity of 12,000 BTU (Reference: http://www.comfortstarusa.com/pro