Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Sample LEED 2009 Basis of Design Document

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Robert Shields  on 

I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.

1
Tue Apr 7, 2015, 3:46 pm

How to calculate area of edible nut- and fruit-bearing plants?

Pilot-Credits SSpc82:Local food production
posted by  Noriko Nagazumi  on 

Is there any guidance on how to calculate the area of edible nut and fruit bearing trees? I assume we could calculate the area based on the position of the tree trunks or the tree crown.

1
Tue Jun 18, 2019, 5:52 pm

Project on Hold

General forums
posted by  Nereyda Rodriguez  on 

Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.

1
Tue Apr 14, 2015, 4:02 pm

C&S 2009 Retail tenant space

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  London Huenefeld  on 

I am working on a C&S project in which most of the tenants are retail stores.

1
Tue Sep 20, 2016, 4:11 pm

Pressure drop adjustment factor with DOAS System

CS-2009 EAc1:Optimize Energy Performance
posted by  Curtis Clark  on 

In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.

1
Thu Apr 9, 2015, 2:51 pm

MR c7 forms

NC-2009 MRc7:Certified Wood
posted by  Mark Ramsey  on 

As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.

1
Mon Apr 13, 2015, 3:04 pm

SHGC Value ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  John Covello  on 

Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.

1
Thu Apr 9, 2015, 2:14 pm

Tricky project - NC, C&S or EBOM?

LEED Rating System Selection
posted by  Maria Glädt  on 

Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b

1
Fri Nov 27, 2015, 6:18 pm

WEp1 for Shopping Center

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

Hello all, We have a shopping center interested in certification with 10 buildings.

1
Sat Jan 16, 2016, 2:13 am

Air Quality Testing - Elevator Lobbies in Parking Garage

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Katherine Wilde  on 

Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above.

1
Fri Nov 27, 2015, 8:44 pm