Sample LEED 2009 Basis of Design Document
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Robert Shields on
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.
How to calculate area of edible nut- and fruit-bearing plants?
Pilot-Credits SSpc82:Local food productionposted by Noriko Nagazumi on
Is there any guidance on how to calculate the area of edible nut and fruit bearing trees? I assume we could calculate the area based on the position of the tree trunks or the tree crown.
Project on Hold
posted by Nereyda Rodriguez on
Our project has been put on hold indefinitely by the Owner. There is a chance that it may come back in a year or two. The project is registered under NC v2009.
C&S 2009 Retail tenant space
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by London Huenefeld on
I am working on a C&S project in which most of the tenants are retail stores.
Pressure drop adjustment factor with DOAS System
CS-2009 EAc1:Optimize Energy Performanceposted by Curtis Clark on
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.
MR c7 forms
NC-2009 MRc7:Certified Woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
SHGC Value ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.
Tricky project - NC, C&S or EBOM?
posted by Maria Glädt on
Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b
WEp1 for Shopping Center
posted by Nate Steeber on
Hello all, We have a shopping center interested in certification with 10 buildings.
Air Quality Testing - Elevator Lobbies in Parking Garage
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Katherine Wilde on
Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above.