Forum quick links
Baseline Lighting Power for a Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
We are replacing the mechanical system, updating the plumbing system and insulating the building envelope for an existing office building.
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize Energy Performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
Demand control ventilation requirement
CI-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi to all: In our project we have a cafeteria (2,000ft2) with the following features: 1. a density of 55 people per 1,000ft2 2. The outdoor airflow (3,600 cfm) is being delivered by an DOAS 3.
(Sample) Lease Agreement
posted by Charalampos Giannikopoulos on
If no tenants have been identified at the time pf project submission for review can the project owner submit a sample of lease agreement and a letter of commitment signed by the owner in lieu of le
Combined car pooling + LEV signage for projects < 10 spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lewis Hewton on
Hi all, I can see from a few discussions on here that it seems acceptable to combine carpooling + LEV signage provided there is no double counting i.e. a total of 10% of spaces are reserved.
Project boundary issues
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Muneeb Haider on
I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site.
Liquid hand soaps/body wash
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Jutta Berns on
We have project that is using a liquid body wash that is technically a liquid hand soap too (purchased as both but in different packaging).
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
dealership building and a detached carwash
posted by Art Kamm on
The project in question consists of a dealership bldg, a detached carwash, and a fuel storage & generator building (3 separate buildings); do they qualify as multiple buildings or a single buil