Hi to all:
In our project we have a cafeteria (2,000ft2) with the following features:
1. a density of 55 people per 1,000ft2
2. The outdoor airflow (3,600 cfm) is being delivered by an DOAS
3. The zone in conditioned with DX constant speed systems
Does this system require a DCV in order to comply with the mandatory provisions?
Thanks in advance.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5907 thumbs up
February 19, 2015 - 10:42 am
It sure sounds like DCV would be required according to Section 6.4.3.9.