Hi to all: In our project we have a cafeteria (2,000ft2) with the following features: 1. a density of 55 people per 1,000ft2 2. The outdoor airflow (3,600 cfm) is being delivered by an DOAS 3. The zone in conditioned with DX constant speed systems Does this system require a DCV in order to comply with the mandatory provisions? Thanks in advance.
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up