Forum quick links
"Determination of Ds Value for worst case scenario"
CI-2009 IEQp1:Minimum IAQ Performanceposted by Cyriac Joseph on
How do we calculate the Ds value for the condition where "The cooling load is low due to minimal envelope and internal loads but the number of occupants are at peak?" We have the following comment
Does mech engineer need to be PE to sign the "signature' box ?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Matt Dem on
Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?
Empty parking spots
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by S. Macgregor on
We are installing alternative-fuel refueling stations, with preferred parking.
Water Efficiency Calculation
NC-2009 WEc3:Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Dance School rating system: EB O+M School or not?
posted by Sophia Spano on
A dance school, one building- 90,000 SF is looking to get certified. I am unsure if it will be EB O+M, or EB O+M Schools. It is not k-12 and not a university.
Dance School rating system: EB O+M School or not?
posted by Sophia Spano on
Hi All, A dance school, one building- 90,000 SF is looking to get certified. I am unsure if it will be EB O+M, or EB O+M Schools. It is not k-12 and not a university.
CMP
posted by Tom Martin on
For v4 projects CM hours would automatically report, will this be the same for the new upgrade for v3?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).