Forum quick links
Custom furniture for LEED project
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Roxanne Button on
I haven't found any other discussions about this - apologies if I missed it somewhere: my client is a custom furniture manufacturer and they are bidding on a LEED CI project.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
Golf Course
CS-2009 SSc1:Site Selectionposted by AtSite Inc on
Our project is being developed on a former golf course.
ETS During Construction
NC-v4 EQp2:Environmental tobacco smoke controlposted by L W on
Does the ETSC prerequisite apply during construction as well?
Hi,
I believe I already know
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Bernardo Ruiz Montoya on
Hi, I believe I already know the answer but I want to make a double check with you.
adjustable Dual Flush valve
NC-2009 WEc3:Water Use Reductionposted by Faisal on
Hi, we are evaluating a dual flush valve for WC, which give us 6 & 9 Litres per flush(adjustable) which aggregates to 7 litres per flush, our project requirement is 3.023 Litres per flush(0.8
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Counters
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Gustavo De las Heras Izquierdo on
Hallo, We are certifying an airport and we would like to know if the counters need to have task lighting. The IEQ Space Matrix does not include this type of building. Thank you
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.
Regional Materials - Steel
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
In order to get regional material credit for steel can an average percentage be used of all the mills that sourced scrap within 500 miles of the project site? For the Extraction Distance can the m