Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Hello everybody, For a data center project we have used the “Minimum Energy Performance Data Center Calculator” to claim saving from the IT load.
Extraction system for storage area
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Miguel Diazgranados on
Project location: Outside Bogotá, Colombia I am currently working on a CS project (a warehouse more specifically) located in a suburban region, near Bogotá-Colombia, called Tocancipá.
DCV modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project I'm modeling has several DOA AHUs. Every AHU has a single CO2 sensor located on the return duct next to the unit.
Energy modeling
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Muzammal Abbas on
Dear Sir, I want to know that is it mandatory to provide energy modeling for commercial interior project's for LEED submission, Now my second question is that i am using a HAP 4.8 and eQUEST softwa
Natural Ventilation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjamin Cullum on
Under option 2 How do you determine how many sampling stations are needed in a building that is uses Natural ventilation?
On-site waste water treatment in LEED V4
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Lorne Mlotek on
Are Lagoons, or septic tanks rewarded at all in LEED V4? This credit was omitted from the new version and I am curious if I installed an on-site waste water treatment facility onsite which dischar
Any HAP Expert?
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Occupants estimate according reference building
CS-2009 PIf3:Occupant and Usage Dataposted by LEED Pro Consultant on
Hello, We are working on a warehouse project that is intended for rental, therefore we don´t have the occupancy for the building since the tenant will adapt the space according to his necessities.
Ability to make a design final submission
posted by Madhura Dhayagude on
I am a part of this project which was registered 3 years ago with Initial review submitted.
NPDc11: are townhomes single dwelling or multiunit buildings