Forum quick links
MPR 6 for Single Tenant Building
CI-2009 PIf1:Minimum Program Requirementsposted by Jonathan Weiss on
We are working on a project where we are the sole tenant in the building. Can we use the whole building meters for our MPR6 reporting if there is no other user in the building?
Showers in group projects
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Stacey Olson on
This piggy-backs to my previous comment about bike rack locations. Per the published Campus/Group Eligibility Credits & Prerequisites for LEED 2009, SSc4.2 - Alternative Transportation Bicycle
No Facility Alterations
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Charalampos Giannikopoulos on
Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?
How do you restore habitat on a reclaimed land?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Dina Ammar on
Would a reclaimed land qualify as a Greenfield Site and can a project on such site earn SSc5.1 under case 1?
long term lease as NC innovation credit
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Maggie Pipek on
Has anyone ever successfully modeled an ID credit for the NC rating system after the CI MRc1.1 Long Term Lease credit?
wall mounted FCUs
NC-2009 IEQp1:Minimum IAQ Performanceposted by Stella Stella on
Hi, We are working on a project with wall mounted FCUs.
LEED ND v3 Examination End Date
posted by Michael McElroy on
According to an update posted May 15 to http://www.usgbc.org/articles/leed-v4-credential-exams-coming-june-2014 "Exams for the LEED Green Associate, BD+C, ID+C and O+M will feature v4 content in J
Floor Diffusers
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Mike oliva on
I'm looking for clarification on how to handle air speed for floor diffusers at the perimeter of a large lobby space.
Core area added to boundary?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Graham Langton on
"When a project has replaced some of the core fixtures, they have essentially brought those fixtures into their LEED-CI project scope of work." A project in which fixtures are replaced in the core
Not what I would have expected
posted by Amy Boyce on
I participated in early discussions on the AP exam update for v4 prior to leaving USGBC, and this sounds very different from what we discussed at that time. Paula - I'd be interested to hear more