Forum quick links
partnership with Honeywell
posted by Tristan Roberts on
USGBC has just announced the partnership I alluded to in this post, with Honeywell.
WEc3 denial
NC-2009 WEc3:Water Use Reductionposted by Therese Thompson on
We received our final review on Friday, and do not understand why Credit WEc3 was denied.
Pursuing LEED NC streamline path
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by American University on
A building earned enhanced refrigerant management for LEED NC but had to add one unit during the performance period due to theft.
Making the Shipping Company Take the Packaging?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Kimberlee Dobbins on
I know I read about a company doing this, but I can not seem to find who it was, or how it was done.
How to model thermal breaks correctly?
NC-2009 EAc1:Optimize Energy Performanceposted by Saju Varghese on
I have a question, we have received a comment from a LEED reviewer requesting for the following information: "Table 1.4 of the template appears to indicate that all the assembly U-value for the ex
Veterinary hospital
NC-2009 SSc2:Development Density and Community Connectivityposted by Alicia Villanueva on
Does a veterinary hospital count towards this credit?
Sharing credit results
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Gustavo De las Heras Izquierdo on
Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 55%, which will give us an exemplary performance point. In addition, 100% of the wastewater is trea
BAS - whole building
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Craig Wilson on
If our project's BAS controls 100% of the building's heating and air conditioning, but only 35% of the building's ventilation (by square footage), can we still pursue this credit?
Redoing MRT measurements after preliminary review
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by American University on
GBCI pointed out to us during their preliminary review that one of our past engineers did an air temp reading in sample spaces rather than a mean radiant temp reading.
Gimmick-ish
posted by Bill Swanson on
This just feels like another gimmick. Oooohhh, flashy lights, look over here. I'm really not impressed with it. What was the target market for this?