Pilot vs v4 Demand Response - Full Automation

Pilot-Credits EApc8:Demand response
posted by  Jennifer Wehling  on 

I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.

0

Masonry Flash Mastic

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Chris Moore  on 

Our masonry contractor submitted VOC documentation on Wire-Bond Aqua Flash Mastic with a VOC content of 270 g/L. I am first not sure if this needs to be submitted for IEQc4.1 or not.

1
Mon Oct 20, 2014, 3:43 pm

How to calculate Squatter Toilet in we p1? and roof garden?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Shenhao Li  on 

HI, i have 2 questions to ask: 1.Now i have a hotel project in china. In this project, Several squatter toilets(with water tank) are designed and will be constructed in the future.

1
Tue Oct 14, 2014, 12:42 pm

exceptions and alternative options for vestibules

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

According to 5.4.3.4 (mandatory provision) enclosed vestibules shall protect building entrances that separate the conditioned space from the exterior.

1
Wed Oct 15, 2014, 12:39 am

LEED V4 DATA CENTER

NC-2009 PIf1:Minimum Program Requirements
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Tue Oct 14, 2014, 11:29 pm

Electric consumption based on EAc1

NC-2009 EAc6:Green power
posted by  Lise Dannesboe  on 

The percentage of RECs is calculated as a percentage of the result of the energy model in EAc1. Does this include or exclude the amount of renewables on site.

1
Wed Oct 15, 2014, 12:42 am

Expansion areas

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gustavo De las Heras Izquierdo  on 

Our LEED Project Boundary includes a future expansion area. This area has grown native species naturally. Can this vegetated area be counted towards this credit?

1
Mon Dec 8, 2014, 6:15 pm

Green Cleaning

NC-2009 IDc1:Innovation in Design
posted by  Stella Stella  on 

Hi, We are trying to document Green cleaning towards 1 point under Innovation for our LEED NC project.Is it sufficient to just follow the EBOM requirement for IEQ P3 & 3.1 to document complianc

1
Wed Oct 15, 2014, 3:26 pm

LEED V4 DATA CENTER

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Mon Dec 8, 2014, 6:21 pm

Green-e equivalency

NC-v4 EAc7:Green power and carbon offsets
posted by  LEED Pro Consultant  on 

I have a question regarding using carbon credits (CERs) from a Clean Development Mechanism project for a New Construction V4 project.

1
Sun Nov 2, 2014, 11:24 pm