Option 4 fuel-efficient car sharing program for a C&S building

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Eleftherios Zacharakis  on 

Hi, our project is a C&S building that does not have parking spaces. However, the owner is interested in participating in a fuel-efficient car sharing program.

1
Fri Sep 19, 2014, 1:47 pm

Plumbing piping insulation?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Saju Varghese  on 

Should plumbing piping insulation be considered for this credit when you are using rigid or flexible glass fiber?

1
Wed Sep 10, 2014, 6:52 pm

IEQc2

NC-2009 IEQc2:Increased Ventilation
posted by  Jimmy Sparkman  on 

I know the intent of IEQc2 is to increase the comfort level of the occupant among other things, but I'm also trying to reduce my outside air from ASHRAE 62.1-2007 levels via demand control ventilat

1
Sun Apr 5, 2015, 6:59 am

Timeline

CI-2009 PIf1:Minimum Program Requirements
posted by  R G  on 

We have recently received substantial completion for construction for one of our projects.

0

review response letter

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Therese Thompson  on 

We are ready to submit our revised application for Final Review, and want to know how/where we should submit/upload the response letter that we've prepared.

1
Wed Sep 10, 2014, 8:41 pm

Rating System ?

LEED Rating System Selection
posted by  Pat Kirwan  on 

Hi All, Looking for some advise on the selection of a rating system. We have an existing building which will undergo a major renovation (just the concrete shell will remain prior to renovation).

1
Fri Nov 27, 2015, 10:02 pm

Smoking room - separate AHU system?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Jens Apel  on 

This is an office building. The designer is proposing to use a single exaust system for one smoking room and other smoke free rooms.

1
Tue Dec 9, 2014, 7:19 am

International Project not eligible for Energy Star Rating

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Se Hyeung Pak  on 

Hi, I am involved in EBOM case located in Korea. I have a couple of Qustions based on the case. We needs to meet the requirements of LEED O&M Certification EA Pre-requisite Case2 option1.

1
Wed Oct 29, 2014, 3:41 pm

energy used on-site vs sold energy

NC-v4 EAc5:Renewable energy production
posted by  LEEDme Lorenzi  on 

I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.

1
Thu Sep 11, 2014, 2:58 pm

gs 11 1993 test VS iso

Retail-CI-v2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Michele Comperti  on 

for a leed platinum project in Europe we must submit a wall paint wich has a certificate for voc content made under an iso 11890 test (product manufacturer is Akzo Nobel Italy factory, product Al

1