Forum quick links
Vestibules
NC-2009 EAp2:Minimum Energy Performanceposted by Viktor Reutherborg on
I'm working on a big building, mostly office but not exclusively, in Stockholm, Sweden. I'm currently working on a restaurant on the ground floor with an entrance from outside.
Site plan without smoking areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Anna Korinkova on
Hello LEEDusers! We are supposed to upload a site plan/map that shows the location of the designated outdoor smoking /nonsmoking areas.
Reporting and metering frequency
NC-v4 WEc4:Water meteringposted by Lorne Mlotek on
In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi
A tower, podium and shared parking on the same site, LEED NC2009
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mais B on
Hi all, I have posted this last week but i haven't got any replies so i am re-posting: "We have an administration complex consisting of two basement levels having parking and utility rooms, and ab
SSp1 description for CS precertification
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Nándor Kovács on
We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site. Can so
"Access to Occupants"
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Omar Elrawy on
Dear All, I have a 6 story office building with one garbage shoot linked to a garbage sorting room outside the building but within the LEED project boundary.
WEp1 & SSc3.2
CI-2009 WEc1:Water Use Reductionposted by Cathal Heneghan on
Hi If water fixtures are not part of the project scope and are not considered for the LEED submission, can the project still pursue SSc3.2 due to existing showers in the base building? I thought
LEED NC or Healthcare for an Oupatient Building with 24h ER
posted by Xavier Valladares on
We have a client that is questioning which LEED versión to use.
local installation in DC
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Kristopher Croghan on
I have a few open offices where multiple occupants work in the same space, our workstation panels are just above the 42" height so we won't be able to qualify as 100% in these areas.
ID Credit for SMaRT Level 3 Products?
CI-2009 IDc1:Innovation in Designposted by Brian Salazar on
Hello! I have used Cradle-2-Cradle Certification (C2C) in the past as a methodology for achieving an Innovation credit. In these cases, 2.5% of material costs fell under the C2C umbrella.