Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vestibules

NC-2009 EAp2:Minimum Energy Performance
posted by  Viktor Reutherborg  on 

I'm working on a big building, mostly office but not exclusively, in Stockholm, Sweden. I'm currently working on a restaurant on the ground floor with an entrance from outside.

1
Fri Aug 15, 2014, 2:29 pm

Site plan without smoking areas

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Anna Korinkova  on 

Hello LEEDusers! We are supposed to upload a site plan/map that shows the location of the designated outdoor smoking /nonsmoking areas.

1
Fri Aug 15, 2014, 1:49 pm

Reporting and metering frequency

NC-v4 WEc4:Water metering
posted by  Lorne Mlotek  on 

In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi

1
Tue Apr 21, 2015, 4:55 pm

A tower, podium and shared parking on the same site, LEED NC2009

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Mais B  on 

Hi all, I have posted this last week but i haven't got any replies so i am re-posting: "We have an administration complex consisting of two basement levels having parking and utility rooms, and ab

0

SSp1 description for CS precertification

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Nándor Kovács  on 

We are working on a project precertification (v2009) and I was suprised that the precertification credit form requires a description of measures that will be implemented at the project site. Can so

1
Mon Aug 18, 2014, 11:58 am

"Access to Occupants"

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Omar Elrawy  on 

Dear All, I have a 6 story office building with one garbage shoot linked to a garbage sorting room outside the building but within the LEED project boundary.

1
Mon Aug 18, 2014, 6:14 pm

WEp1 & SSc3.2

CI-2009 WEc1:Water Use Reduction
posted by  Cathal Heneghan  on 

Hi If water fixtures are not part of the project scope and are not considered for the LEED submission, can the project still pursue SSc3.2 due to existing showers in the base building? I thought

1
Tue Dec 29, 2015, 6:52 pm

LEED NC or Healthcare for an Oupatient Building with 24h ER

LEED Rating System Selection
posted by  Xavier Valladares  on 

We have a client that is questioning which LEED versión to use.

1
Mon Aug 18, 2014, 6:34 pm

local installation in DC

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Kristopher Croghan  on 

I have a few open offices where multiple occupants work in the same space, our workstation panels are just above the 42" height so we won't be able to qualify as 100% in these areas.

1
Mon Aug 18, 2014, 6:10 pm

ID Credit for SMaRT Level 3 Products?

CI-2009 IDc1:Innovation in Design
posted by  Brian Salazar  on 

Hello! I have used Cradle-2-Cradle Certification (C2C) in the past as a methodology for achieving an Innovation credit. In these cases, 2.5% of material costs fell under the C2C umbrella.

0