NC-2009 PIf2:Project Summary Details
posted by  Indochine Engineering VN  on 

Hi! My project is using double glazing facade, there is inner glass at the floor, then big air gap and the outer glass that is hang by a steel structure.

1
Sat Jul 26, 2014, 5:01 am

FIre station modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  David Hahn  on 

I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.

1
Tue Jul 8, 2014, 3:08 pm

Large footage residence and threshold adjustment

LEED for Homes (LEED-H) Forum
posted by  LEED Pro Consultant  on 

Hello. We are in the very first steps in our first LEED Home.

1
Wed Jul 9, 2014, 2:50 am

Regional- Additives Taken into Consideration?

CS-2009 MRc5:Regional Materials
posted by  Roberto Meza  on 

I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp

1
Tue Jul 8, 2014, 10:58 pm

CS MPR2: reclaimed land without development previously

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Vivien Wong  on 

Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement

0

IAQ Option #1

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  David Biggs  on 

For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage.

1
Sat Jul 26, 2014, 12:37 pm

Appealing WEp1

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Anu Sumanth  on 

We have a small two story core and shell project. The owner provided rough ins for plumbing fixtures to be installed by the tenant.

1
Wed Jul 23, 2014, 2:08 pm

Bus Stops for Exemplary Performance

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Yuran Pan  on 

There are around 10 bus stops that are within 1/4 mile walking distance from the building main entrance (Some of the bus stops only have one bus line).

1
Mon Jul 28, 2014, 8:16 pm

TI in a LEED certified Core & Shell Building

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Chris Hammett  on 

Hello. I am currently working on a tenant improvement project located within a building that was previously LEED certified under the Core & Shell rating system.

1
Fri Jul 18, 2014, 2:45 am

selecting controller efficiency manufacturer company

NC-2009 WEc1:Water Efficient Landscaping
posted by  prerana tuladhar  on 

how to select the controller effciency manufacturer company? which company is the best and supplies worldwide??

0