For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage. In the past under version 2 the only way that was acceptable to reviewers was showing a trend graph from the controls automation system which requires a flow sensor installed in all air handlers to be read in the automation software. Is this not the case any longer?