Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Qualification for LEED CS vs. NC

ND-v2009 PIf1:Development Program and Site Type
posted by  Jin Yang  on 

Hi Eliot, The master planning project consists of two parcels with three highrise buildings.

0

Project Type and Rating Type for Block Project

General forums
posted by  Jin Yang  on 

I working on a master planning development consists of two parcels with three highrise buildings intended for highend administrative offices.

1
Sun Apr 6, 2014, 3:55 am

is this clarification ok?

NC-2009 EAp2:Minimum Energy Performance
posted by  Shenhao Li  on 

automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en

1
Tue Mar 11, 2014, 2:48 pm

Natural landscape to recover on site

NC-2009 WEc1:Water Efficient Landscaping
posted by  Luis Huertas  on 

Our project is going to allow the natural landscape to return to the landscape areas of the project. Can I claim no potable use and achieve the credit using this strategy?

1
Tue Mar 11, 2014, 1:54 pm

Entering Transporation Management Plan on LEED Online

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Rosemary Mascali  on 

My client is pursuing an exemplary point for a Transportation Management Plan for a V2009 NC application.

1
Tue Mar 11, 2014, 5:58 pm

Section 11 or Appendix G?

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Gross  on 

Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.

1
Tue Mar 11, 2014, 6:43 pm

CFL compliance

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Gustavo De las Heras Izquierdo  on 

I am checking a compact florescent lamps compliance (integral ballast, bare bulb), which should be 10,000 rated hours according to the credit table. The CFL cut-sheet I've been provided with state

1
Wed Mar 12, 2014, 12:19 am

LEED Project Boundary for a Transit Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kimberlyn Caoagas  on 

BACKGROUND INFO: - Attempting LEED EB: O&M Certification for a historical train/transit station - The first floor of the station has an opening/threshold (no enclosures) that connects to an u

0

Project Scope and Tenant Scope

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Leandro Silva  on 

Another one I can´t quite get my head around. Our client will be the sole tenant in a small commercial building.

1
Fri Apr 11, 2014, 5:16 pm

Purchasing RECS after the Performance Period

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Summer Gorder  on 

Based on our reviewer clarifications, we are needing to take a different tactic to meet our goal.

0