Forum quick links
Qualification for LEED CS vs. NC
ND-v2009 PIf1:Development Program and Site Typeposted by Jin Yang on
Hi Eliot, The master planning project consists of two parcels with three highrise buildings.
Project Type and Rating Type for Block Project
posted by Jin Yang on
I working on a master planning development consists of two parcels with three highrise buildings intended for highend administrative offices.
is this clarification ok?
NC-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en
Natural landscape to recover on site
NC-2009 WEc1:Water Efficient Landscapingposted by Luis Huertas on
Our project is going to allow the natural landscape to return to the landscape areas of the project. Can I claim no potable use and achieve the credit using this strategy?
Entering Transporation Management Plan on LEED Online
posted by Rosemary Mascali on
My client is pursuing an exemplary point for a Transportation Management Plan for a V2009 NC application.
Section 11 or Appendix G?
CI-2009 EAp2:Minimum Energy Performanceposted by Steve Gross on
Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.
CFL compliance
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Gustavo De las Heras Izquierdo on
I am checking a compact florescent lamps compliance (integral ballast, bare bulb), which should be 10,000 rated hours according to the credit table. The CFL cut-sheet I've been provided with state
LEED Project Boundary for a Transit Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kimberlyn Caoagas on
BACKGROUND INFO: - Attempting LEED EB: O&M Certification for a historical train/transit station - The first floor of the station has an opening/threshold (no enclosures) that connects to an u
Project Scope and Tenant Scope
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Leandro Silva on
Another one I can´t quite get my head around. Our client will be the sole tenant in a small commercial building.
Purchasing RECS after the Performance Period
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Summer Gorder on
Based on our reviewer clarifications, we are needing to take a different tactic to meet our goal.