Commercial buildings?

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Jonathan Miller  on 

Are commercial buildings exempt from this prerequisite due to the "residential only" language? Thanks!

1
Mon Feb 10, 2014, 6:14 pm

LEED-NC MPR #6, Sharing Whole-Building and Water Usage Data

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Greengrade User  on 

We have a building that will be connected to a central Biomass Steam Plant for heating the heat pump water and providing steam to the kitchen and a future laundry.

1
Mon Feb 10, 2014, 8:17 pm

LEED DESv2, System 8 and Chilled Water Temp Reset

CS-2009 EAp2:Minimum Energy Performance
posted by  Matt Humphreys  on 

For baseline HVAC system #8 modeled with purchased chilled water according to Option 1 of Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 guideline, does the Chilled-Water S

1
Tue Feb 11, 2014, 3:23 pm

Calculating new Construction and existing renovated GFS

NC-2009 PIf2:Project Summary Details
posted by  Alfred Servodidio  on 

On our project we are removing all of the floors, roof and basement slabs to be replaced with new.

1
Sat Feb 22, 2014, 7:04 pm

Definition of supermarket for SS C2 option2 credit

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rosemary Muller  on 

Is there a definition of what can be counted as a "supermarket" instead of just a "convenience grocery"? What features is a "supermarket" required to have?

1
Tue Feb 11, 2014, 2:27 pm

FTE - partially occupied building

Calculating FTEs
posted by  Eric Carter  on 

For our current project, the building will not be occupied to full capacity until about 5 years after substantial completion (25% of the project will be shelled.

1
Fri Mar 7, 2014, 5:03 pm

construction site facilities outside of LEED project boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Doreen Kruschina  on 

Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.

1
Tue Feb 11, 2014, 1:08 pm

LEED EB O&M Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sathish Kumar  on 

There are 3 buildings in a single site and these 3 buildings have a shared basement parking.

1
Mon Feb 24, 2014, 3:04 pm

LEED CS VS LEED NC

LEED Rating System Selection
posted by  Javier Garcia Jones  on 

Hi, I'm working in major renovation on an office project that is going to be lease out once it's finnished. Project scope includes initial tenant fit out (HVAC, lignting, ceilings,etc). Which rati

1
Sat Mar 8, 2014, 2:47 am

high - rise residential building??

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Davide Filippi  on 

From the supplemental Guidance resion 2: "LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high - rise resi

1
Tue Feb 11, 2014, 9:54 pm