Commercial buildings?
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Jonathan Miller on
Are commercial buildings exempt from this prerequisite due to the "residential only" language? Thanks!
LEED-NC MPR #6, Sharing Whole-Building and Water Usage Data
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Greengrade User on
We have a building that will be connected to a central Biomass Steam Plant for heating the heat pump water and providing steam to the kitchen and a future laundry.
LEED DESv2, System 8 and Chilled Water Temp Reset
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
For baseline HVAC system #8 modeled with purchased chilled water according to Option 1 of Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 guideline, does the Chilled-Water S
Calculating new Construction and existing renovated GFS
NC-2009 PIf2:Project Summary Detailsposted by Alfred Servodidio on
On our project we are removing all of the floors, roof and basement slabs to be replaced with new.
Definition of supermarket for SS C2 option2 credit
NC-2009 SSc2:Development Density and Community Connectivityposted by Rosemary Muller on
Is there a definition of what can be counted as a "supermarket" instead of just a "convenience grocery"? What features is a "supermarket" required to have?
FTE - partially occupied building
posted by Eric Carter on
For our current project, the building will not be occupied to full capacity until about 5 years after substantial completion (25% of the project will be shelled.
construction site facilities outside of LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Doreen Kruschina on
Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.
LEED EB O&M Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sathish Kumar on
There are 3 buildings in a single site and these 3 buildings have a shared basement parking.
LEED CS VS LEED NC
posted by Javier Garcia Jones on
Hi, I'm working in major renovation on an office project that is going to be lease out once it's finnished. Project scope includes initial tenant fit out (HVAC, lignting, ceilings,etc). Which rati
high - rise residential building??
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Davide Filippi on
From the supplemental Guidance resion 2: "LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high - rise resi