For baseline HVAC system #8 modeled with purchased chilled water according to Option 1 of Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 guideline, does the Chilled-Water Supply Temperature Reset described in Appendix G3.1.3.9 apply?

Or would this be considered a feature of the upstream equipment that is not required to be modeled under option 1?