SSp1 fo contiguous sites

LEED Guidance for Campuses and Multiple Buildings
posted by  Donald Green  on 

If you have several sites within the Campus Master Site whereby the projects are to be constructed at the same time and the project sites are contiguous, is there any way to not have a separate ESC

1
Sat Jul 26, 2014, 4:37 am

Restoration planned for future phase

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Heather DeGrella  on 

If the restoration of habitat is planned for a future phase, is waiting until the restoration is complete the only option a project has for submitting for this credit?

1
Mon Feb 24, 2014, 2:43 pm

Blower Door Testing in non-smoking rooms

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Emmanuel Pauwels  on 

In our hotel project, most rooms are non-smoking. Do they comply or do we have to test on all rooms even when they are designated as non smoking?

1
Mon Feb 17, 2014, 6:36 pm

Daylight levels in spaces adjacent to atrium

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Paulette Alioa  on 

Our project team is pursuing the Daylight credit for EBOM v2009, using the calculations path 3 - Measurement - for a renovated high school building that has a large central atrium space which featu

1
Tue Feb 4, 2014, 6:13 pm

material overlap between IEQ credits 4.1, 4.2, and 4.3

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  KIMBERLY KRAFT  on 

Hello- We are submitting for IEQ credits 4.1, 4.2, and 4.3 and there are several materials that overlap all three of these categories, primarily carpet adhesive (which would fall under 4.1 and 4.3)

1
Tue Feb 4, 2014, 6:06 pm

SS c4.2 calculate a Hotel occupancy

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Osama Hassan  on 

How we can calculate the total occupancy (all building users) of a Hotel building registered under NC v3? And if GBCI has reference documents (information).Thanks

1
Fri Feb 7, 2014, 1:35 pm

Energy Star: Tenant problem

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Hatice G.  on 

Hi, I am working on a multi-tenant office building. One tenant with over 70% of the rented area doesn't want to give their concsumption data.

1
Mon Feb 17, 2014, 5:21 pm

Do I model part-load curve for the DES default efficiency?

General forums
posted by  X. Chen  on 

The DES guideline (2010) allows us to model DES cooling plant with a COP of 4.4, which includes cooling towers and primary pumps.

1
Mon Feb 10, 2014, 2:33 pm

Farmland Development?

NC-2009 SSc1:Site Selection
posted by  Cynthia Estrada  on 

We have a site that has a strip of prime farmland, which we are not building on per se. We have a retention pond with a water feature in mind for that area.

1
Wed Feb 5, 2014, 6:23 pm

Exempting Space for LEED EBOM

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michael McPheron  on 

Our building includes offices attached to a manufacturing facility by a hallway and kitchen area. The initial goal was to just get the offices and kitchen area LEED certified for EBOM.

1
Sat Mar 8, 2014, 3:36 am